[{"data":1,"prerenderedAt":73},["ShallowReactive",2],{"q-fire-108-1-fire-law-034":3},{"subject":4,"subjectSlug":5,"subjectKicker":6,"subjectShort":7,"question":8,"related":27,"sameNumber":52,"hasEssay":26},"消防法規概要","fire-law","消防法規 · Fire Code","消防法規",{"id":9,"webId":10,"year":11,"session":12,"subject":4,"number":13,"stem":14,"options":15,"answer":20,"answerNote":21,"images":22,"imagesPending":23,"lawTimestamp":11,"explanation":24,"explanationDeep":25,"freq":12,"indexable":26},"fire-108-1-消防法規概要-034","fire-108-1-fire-law-034",108,1,34,"依消防法施行細則，有關消防安全設備之設計、監造、裝置及檢修工作項目之規定，下列何者正確？",{"A":16,"B":17,"C":18,"D":19},"檢修：指依消防法規定，受託檢查各類場所之消防安全設備，並製作消防安全設備檢修報告書","裝置：指消防安全設備種類及數量之規劃，並製作消防安全設備圖說","監造：指消防安全設備施工完成後之功能測試，並製作消防安全設備測試報告書","設計：指消防安全設備施工中須經試驗或勘驗事項之查核，並製作紀錄","A",null,[],false,"本題考點：《消防法施行細則》就設計、監造、測試、檢修四項工作所下的定義，考的是四個名詞與四段敘述有沒有配對正確。\n【正解理由】依《消防法施行細則》關於消防安全設備之設計、監造、測試及檢修工作項目之規定，「檢修」指依《消防法》規定受託檢查各類場所之消防安全設備，並製作消防安全設備檢修報告書；判別關鍵有二——產出文件是「檢修報告書」，行為時點在建築物使用期間。本項敘述與該定義相符，故選 A。\n【逐項排除】\n(A) 受託檢查各類場所之消防安全設備並製作檢修報告書，正是檢修的法定內涵，執行者為受管理權人委託之專業人員或機構。\n(B) 「消防安全設備種類及數量之規劃，並製作消防安全設備圖說」是設計的定義，被錯掛在裝置名下；且施行細則所定四項工作中並無「裝置」一詞。\n(C) 「施工完成後之功能測試，並製作消防安全設備測試報告書」是測試的定義，監造發生於施工過程中，不是完工之後。\n(D) 「施工中須經試驗或勘驗事項之查核，並製作紀錄」是監造的定義，設計則在動工前完成圖說，兩者的時序被顛倒。\n【記憶點】照時間軸排：設計畫圖說、監造查施工、測試出測試報告書、檢修顧使用中。","這四個名詞把一棟建築物從無到有、再到長期使用的消防安全把關流程切成四段，理解時序遠比死背文字有效。\n第一段是「設計」，發生在動工之前，工作內容是規劃各類場所應設置的消防安全設備種類與數量，並繪製成消防安全設備圖說。這份圖說接著要送消防機關審查，《消防法》第 10 條即明定供公眾使用建築物之消防安全設備圖說，應由直轄市、縣（市）消防機關於主管建築機關許可開工前審查完成；非供公眾使用建築物變更為供公眾使用，或原供公眾使用建築物變更為他種公眾使用時，主管建築機關應會同消防機關審查其消防安全設備圖說，可見設計的產出直接銜接行政審查。\n第二段是「監造」，發生在施工中，針對須經試驗或勘驗的事項逐一查核並製作紀錄。重點在「過程中」與「紀錄」——配管的水壓試驗、埋設前的隱蔽部分查驗，一旦被覆蓋就無從事後檢查，因此必須在施工當下留下證據。\n第三段是「測試」，發生在施工完成後，對設備進行功能測試並製作消防安全設備測試報告書；這份報告書是申請竣工查驗的必要文件，也是區分測試與監造的關鍵：同樣是查，一個在完工後查功能、產出報告書，一個在施工中查工序、產出紀錄。\n第四段是「檢修」，發生在建築物使用期間，受託檢查各類場所之消防安全設備並製作檢修報告書，屬定期反覆履行的事項，與前三段的一次性工作性質截然不同。\n記憶口訣可用「圖說—紀錄—測試報告書—檢修報告書」四份文件對應四個階段，題目只要給出文件名稱，答案幾乎立刻確定。最高頻的陷阱在於「測試報告書」與「檢修報告書」僅二字之差，卻分屬完工前後；次高頻的陷阱是題目自創「裝置」「施工」「監工」等施行細則未定義的名詞充當選項，看到即可直接排除。延伸考點包括各階段的執行資格分工、檢修結果申報的期限與受理機關，以及未依規定辦理時的效果。",true,[28,32,36,40,44,48],{"webId":29,"stem":30,"number":31,"year":11,"session":12},"fire-108-1-fire-law-033","依各類場所消防安全設備檢修及申報作業基準規定，有關配線絕緣阻抗試驗合格之判定，若電壓超過 300 V 者，其絕緣電阻值至少應為多少以上？",33,{"webId":33,"stem":34,"number":35,"year":11,"session":12},"fire-108-1-fire-law-035","依建築技術規則建築設計施工編規定，女兒牆之高度應在多少公尺以內？",35,{"webId":37,"stem":38,"number":39,"year":11,"session":12},"fire-108-1-fire-law-032","依各類場所消防安全設備檢修及申報作業基準規定，有關避難器具開口部大小之檢查，下列何者正確？",32,{"webId":41,"stem":42,"number":43,"year":11,"session":12},"fire-108-1-fire-law-036","依消防幫浦加壓送水裝置等及配管摩擦損失計算基準，下列何者不符合呼水裝置之規定？",36,{"webId":45,"stem":46,"number":47,"year":11,"session":12},"fire-108-1-fire-law-031","依消防機關辦理建築物消防安全設備審查及查驗作業基準規定，消防安全設備圖說審查及竣工查驗之期限，以受理案件後Ｘ至Ｙ日內結案為原則。但供公眾使用建築物或構造複雜者，得視需要延長，並通知申請人，最長不得超過Ｚ日，請問下列何者正確？",31,{"webId":49,"stem":50,"number":51,"year":11,"session":12},"fire-108-1-fire-law-037","依避難器具支固器具及固定部之結構、強度計算及施工方法規定，裝置避難器具之固定部，應能承受承載荷重與附加荷重之和。若避難器具為緩降機，其承載荷重應為最大使用人數乘以多少？",37,[53,57,61,65,69],{"webId":54,"year":55,"stem":56,"number":13},"fire-114-1-fire-law-034",114,"依消防法施行細則規定，下列何者非屬消防防災計畫應包括事項？",{"webId":58,"year":59,"stem":60,"number":13},"fire-113-1-fire-law-034",113,"有關防火牆及防火水幕設置基準規定，下列敘述何者錯誤？",{"webId":62,"year":63,"stem":64,"number":13},"fire-112-1-fire-law-034",112,"避難器具支固器具以直接裝置在建築物主要構造部之施工方法，下列敘述何者正確？",{"webId":66,"year":67,"stem":68,"number":13},"fire-111-1-fire-law-034",111,"依消防安全設備及必要檢修項目檢修基準規定，對二氧化碳滅火器進行重量檢查時，如失重超過多少比例以上或壓力表示值在綠色範圍外時，應予以更新，下列何者正確？",{"webId":70,"year":71,"stem":72,"number":13},"fire-110-1-fire-law-034",110,"依消防安全設備及必要檢修項目檢修基準規定，室內消防栓設備水帶製造年份超過 10 年應使用耐水壓試驗機，施以 X kgf\u002Fcm2 以上水壓試驗 Y 分鐘合格，始得繼續使用。X＋Y 為多少？",1785129970379]